Skye for maintenance
The MX view is the aircraft record: write-ups, MEL deferrals, inspections, ADs, components, parts and the aircraft logbook. Maintenance dispositions every write-up. Skye drafts the paperwork from the record; the authorized person reviews it and signs.
Skye reports what the record says. It never decides airworthiness or tells a mechanic what to do. Status is data; the signer is accountable.
The fleet at a glance
The Aircraft tab lists each tail with one status dot and a plain description of what the record shows, for example "2 open write-ups · not yet dispositioned by MX", "3 MEL deferrals open · earliest expires in 4 days", "Inspection overdue by 3 days" or "No open items on record". Skye never labels an aircraft airworthy or not airworthy.
| Dot | What the record shows |
|---|---|
| Green | No open or near-limit items on record |
| Amber | An item is near a limit (a deferral close to expiry, an inspection or AD coming due) |
| Red | An open write-up not yet signed off, or an item past its limit (see the release gate below) |
| Grey | Required records not on file. Never assumed current. |
Compliance puts everything due or overdue across the fleet on one screen: inspections, scheduled tasks, part life limits, ADs, MEL and NEF deferral expiries and open write-ups, each with days and hours remaining. Items with several limits (calendar, flight hours, cycles) are due at whichever comes first.
From write-up to return to service
A write-up can come from a pilot (in Skye or from the flight log), from MX with + File Squawk, or from a photo with Photo Squawk, where Skye drafts the write-up from the picture for you to confirm. Each one becomes an open item on the tail.
| Step | Who | What's recorded |
|---|---|---|
| Identified | Pilot or MX | Tail, description, who reported it and when |
| Approve repair | MX control | Approval and note |
| In work (optional) | Mechanic | Progress note and expected return date. Use it when the job spans a shift or waits on parts. |
| Clear to close | Mechanic | Corrective action (drafted from the record, edit as needed), reference data, task-card steps all completed, ops check result, photo or video evidence |
| Return to service | Authorized MX person | Name, certificate type and number, signed return-to-service entry |
Approve repair, clear to close and return to service are required, in that order; in work is optional. Every step is a signed event on the write-up's timeline and adds a drafted entry to the Aircraft Logbook. A signed record isn't edited. A correction is a signed amendment, with a reason, that supersedes the earlier entry; both stay on the record.
Defer under your MEL
Instead of repairing now, MX can defer an item under the operator's own MEL in a few taps:
- Find the MEL item. Search your MEL by item number, ATA chapter, system or keyword, filtered to the aircraft type.
- Complete the MEL steps. Skye fills in the category, repair interval, hours or cycles limits and any operating restrictions from the MEL item, never from memory. You confirm the (M) maintenance procedure is done, the (O) operations procedure is in place, and the inoperative placard is installed.
- Sign.
Skye then tracks the deadline. Category A uses the interval stated in the MEL item. B, C and D use the standard calendar intervals (3, 10 and 120 consecutive calendar days, not counting the day the discrepancy was recorded), as defined in the MMEL preamble that your MEL is built from. Cite the MMEL preamble and your MEL item when asked for the source. Where the MEL item also limits hours or cycles, the earliest limit controls. The MEL revision in force for that aircraft type is stored with the deferral. The MEL tab lists every active deferral with its deadline, reference and restrictions.
Also available:
- One-time extension of a deferred Category B or C item, recorded with the person who authorized it under your MEL extension procedure.
- NEF deferral under your operator's NEF programme, with its authorization.
- If no MEL item is on file, you can still defer by entering the category and MEL reference yourself.
The release gate
If the record shows any airworthiness item out of its limits, Dispatch can't release the aircraft and the crew can't accept the package. There's no override. That covers:
- a task, inspection or AD overdue by any of its limits and not covered by an approved extension;
- an MEL or NEF deferral past its expiry;
- an open write-up that MX hasn't dispositioned.
Only an MX record action clears it: a task signed complete, an approved extension recorded, a valid deferral, or a return to service. This is a fact about the record, not a judgment. Every block and every clear is logged. Dispatch →
Other MX tabs
| Tab | What it holds |
|---|---|
| Scheduled MX / Inspections | Calendar- and hour-based items (100-hour, annual, phase checks, recurring ADs). Add items and sign them complete; completion writes the logbook entry. |
| ADs / SBs | Airworthiness directive compliance per tail; record compliance with + Record AD Compliance |
| Warranty | Engine, avionics and component coverage with expiry. Informational only; it never affects airworthiness. |
| NEF | Nonessential Equipment and Furnishings: inoperative non-essential items deferred under your FAA-approved NEF program (MEL preamble), with condition and program reference |
| Parts | Inventory as a working sheet: on hand against minimum, on order, shelf life, missing 8130-3 / Form 1 release certificates, cores due back, quarantine and parts cost per aircraft. Every movement is an event; nothing is overwritten. |
| Aircraft Logbook | The append-only maintenance logbook for each tail |
| Notifications | MX emails: new write-ups, deferrals, expiries, items coming due, sign-offs and a daily fleet status |
| Fleet Map | Your aircraft on a live map from ADS-B |
| Compliance setup | Your OpSpec A025, A061, data sources and MEL headers. Trust → |
| Library | Controlled documents, with full revision history |